Search scope:
排序: Display mode:
Weilian QU, Jianwei TU
Frontiers of Structural and Civil Engineering 2009, Volume 3, Issue 1, Pages 32-41 doi: 10.1007/s11709-009-0003-8
Keywords: Three-Gorges ship lift tower whipping effect magnetorheological (MR) intelligent isolation system neural
Yang Fuying,Feng Xiaolin,Li Xiaoping
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 55-58
The structure of ship lift tower in Three Gorges Project, belonging toTemperature control and crack prevention technology for concrete in ship lift tower of Three Gorges Projecthas important reference value to research the technical level of temperature control measures for shiplift projects at home and abroad, to improve the quality of concrete construction in hydropower projects
Keywords: ship lift tower concrete temperature control crack prevention Three Gorges Project ship lift
Construction summary of Three Gorges Project ship lift
Zhao Xijin
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 9-14
The ship lift of Three Gorges Project is huge and technically complex, and as there is no similar ship lift in the world as a precedent putting into operation, it has beenThe design and research process of Three Gorges Project ship lift , has been strongly supported by manyAfter scheme comparison, the Three Gorges Project ship lift eventually identified as rack and pinionand reliable operation of ship lift.
Keywords: construction review ship lift Three Gorges Project
Support system load test of beam Bailey truss of Three Gorges Project ship lift
Wang Wenliang,Xiao Chuanyong,Zhang Junxia
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 50-54
During the continued construction of Three Gorges Project ship lift,
Keywords: beam Bailey truss experiment Three Gorges Project ship lift
Control measures of installation precision of Three Gorges Project ship lift rack and nut column
Wei Yan,Peng Hanlin,Lin Fan
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 91-96
Keywords: Three Gorges Project ship lift rack nut column installation of control precision control
Shu CHEN, Menghan SHANG, Jianping WANG
Frontiers of Engineering Management 2021, Volume 8, Issue 1, Pages 135-147 doi: 10.1007/s42524-020-0125-1
Keywords: vertical ship lift initial fire fire evacuation numerical simulation stair elevator
Design and construction of steel roof truss on top of Three Gorges Project ship lift machine room
Sun Changzhong
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 33-39
Keywords: ship lift computer room steel roof truss design construction Three Gorges Project
Clearance grouting process test of Three Gorges Project ship lift rack and nut column
Zhan Jianxia and Li Jihu
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 45-49
Keywords: rack nut column grouting ship lift Three Gorges Project
Safety monitoring and analysis on crossbeam supporting system of Three Gorges Project ship lift
Liu Xinqing,He Wei
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 108-112
Keywords: Three Gorges Project ship lift safety monitoring crossbeam supporting system Bailey rack
Deformation monitoring on Three Gorges Project ship lift tower during construction period
Qiu Zhangyun,Luo Chen
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 102-107
Keywords: Three Gorges Project ship lift tower column deformation monitoring total station polar coordinate
Construction technology of Three Gorges Project ship lift hydraulic self-climbing formwork
Dai Zhiqing
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 22-26
Keywords: tower concrete hydraulic self-climbing formwork concrete pouring Three Gorges Project ship lift
Construction procedure study of ship chamber of Three Gorges Project ship lift
Zeng Ming
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 40-44
Aiming at the impact of load imposed order of balance weight and shipReasonable ship lift ship compartments chamber construction procedure and construction schedule arrangementlift commissioning.Engineering practice proved that chamber construction procedures of Three Gorges Project lift ship establishedThree Gorges Project lift ship and guarantee the safe operation of ship lift. these construction procedures
Keywords: construction procedure ship chamber ship lift Three Gorges Project
Research on concreting equipment planning of ship lift boat cab segment in Three Gorges Project
Huang Jiaquan,Ma Shaofu,Yu Yongjun
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 59-63
Keywords: construction equipment equipment layout concrete pouring boat cab Three Gorges Project ship lift
Wei Shuman,Zhang Weiming and Li Chenzhi
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 87-90
Keywords: ship lift metal structure embedded parts high precision installation technology Three Gorges Project
Construction technology of tower column of Three Gorges Project ship lift
Zhou Jianhua
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 15-21
This paper firstly describes the whole construction program of the tower column. Then the important and difficult construction problems have been analyzed, such as the precision control of civil structure, the precision control of metal structures and its embedded parts, concrete temperature control and crack prevention, and safety control. At the same time, the construction surveying control technique, the temperature control and crack prevention technique of thin wall concrete, high precision concrete continuous and rapid construction technique,metal structure construction technique,and the construction technique of high altitude and large span beam structure have been made a systemic summary. The application of those construction techniques meets the requirement of high precision construction of the tower column and ensures its smooth construction. Meanwhile, these construction techniques lay a solid foundation for the construction of similar projects.
Keywords: ship lift tower column construction techniques Three Gorges Project
Title Author Date Type Operation
Theoretical and experimental study on seismic response control on top of Three-Gorges ship lift towers
Weilian QU, Jianwei TU
Journal Article
Temperature control and crack prevention technology for concrete on ship lift tower of Three Gorges Project
Yang Fuying,Feng Xiaolin,Li Xiaoping
Journal Article
Support system load test of beam Bailey truss of Three Gorges Project ship lift
Wang Wenliang,Xiao Chuanyong,Zhang Junxia
Journal Article
Control measures of installation precision of Three Gorges Project ship lift rack and nut column
Wei Yan,Peng Hanlin,Lin Fan
Journal Article
Evacuation strategies for vertical ship lift during initial fire: Integrated application of stairs and
Shu CHEN, Menghan SHANG, Jianping WANG
Journal Article
Design and construction of steel roof truss on top of Three Gorges Project ship lift machine room
Sun Changzhong
Journal Article
Clearance grouting process test of Three Gorges Project ship lift rack and nut column
Zhan Jianxia and Li Jihu
Journal Article
Safety monitoring and analysis on crossbeam supporting system of Three Gorges Project ship lift
Liu Xinqing,He Wei
Journal Article
Deformation monitoring on Three Gorges Project ship lift tower during construction period
Qiu Zhangyun,Luo Chen
Journal Article
Construction technology of Three Gorges Project ship lift hydraulic self-climbing formwork
Dai Zhiqing
Journal Article
Construction procedure study of ship chamber of Three Gorges Project ship lift
Zeng Ming
Journal Article
Research on concreting equipment planning of ship lift boat cab segment in Three Gorges Project
Huang Jiaquan,Ma Shaofu,Yu Yongjun
Journal Article
High precision installation technology of metal structure embedded parts of Three Gorges Project shiplift
Wei Shuman,Zhang Weiming and Li Chenzhi
Journal Article